THE ARCHIVE FILES > Archive-2025 > 2. A load of engineering trains-02.01.25
The second day of the year dawned very different to the first being sunny, bright and cold. RTT indicated a number of infrastructure trains should pass through the village in association with a possession of the slow lines between Cheddington and Tring. Unfortunately, the possession appeared to have overrun with all of the trains leaving it extremely late and the lines closed to all trains until the mid-afternoon causing much delays for all services with all having to use the fast lines.
The second day of the year dawned very different to the first being sunny, bright and cold. RTT indicated a number of infrastructure trains should pass through the village in association with a possession of the slow lines between Cheddington and Tring. Unfortunately, the possession appeared to have overrun with all of the trains leaving it extremely late and the lines closed to all trains until the mid-afternoon causing much delays for all services with all having to use the fast lines.
Click here to search The Archive Files
|
Images 1-9 of 9 displayed.
Images 1-9 of 9 displayed.