THE ARCHIVE FILES > Archive-2023 > 22. Engineering works at Roade-02.04.23
With OpenTrainTimes showing the fast lines closed from Hanslope to Hillmorton Junctions (near Rugby) Network Rail was able to undertake various engineering works on the Weedon loop with all traffic diverted via Northampton. During the afternoon I was aware of all trains giving the obligatory toot warning track workers just across the field from home so I took a walk to find out what was going on.
With OpenTrainTimes showing the fast lines closed from Hanslope to Hillmorton Junctions (near Rugby) Network Rail was able to undertake various engineering works on the Weedon loop with all traffic diverted via Northampton. During the afternoon I was aware of all trains giving the obligatory toot warning track workers just across the field from home so I took a walk to find out what was going on.
Click here to search The Archive Files
|
Images 1-7 of 7 displayed.
Images 1-7 of 7 displayed.