The shunter walks the length of the MBA box wagons in order to operate the ground frame so that it can leave. It will follow the GCR tracks a very short distance and then head a short distance northeast on a sharp curve towards Winslow. The shunter will then detach the 56 and it will run round the wagons to then head southwest back to Didcot via Bicester and Oxford. On arrival at Didcot, it will enter the power station complex, be loaded with more flyash and do the whole thing all over again!
|