Crossing over from the down mainline to the bi-directional platform one 450108 arrives at Havant working the 12.30 Waterloo to Portsmouth Harbour service. Just behind the rear of the train is the level crossing and footbridge on New Lane and the redundant, boarded up and ivy-clad signal box.
|