Image 66768, 12.03 Birch Coppice-Felixstowe North (4L05, 81L), Hyde Road bridge

66768, 12.03 Birch Coppice-Felixstowe North (4L05, 81L), Hyde Road bridge
66768, 12.03 Birch Coppice-Felixstowe North (4L05, 81L), Hyde Road bridge 
 The long but rather lightly loaded 4L05 12.03 Birch Coppice to Felixstowe Saturday afternoon service comes through Roade cutting at a fair pace with GBRf's 66768 leading. With the fast lines via Weedon closed all weekend for engineering works some workers are seen undertaking work on the cutting wall to the top left. They appeared to be drilling into the missionary and attaching harness points. 
 Keywords: 66768 12.03 Birch Coppice-Felixstowe North 4L05 Hyde Road bridge GBRf
66768, 12.03 Birch Coppice-Felixstowe North (4L05, 81L), Hyde Road bridge 
 The long but rather lightly loaded 4L05 12.03 Birch Coppice to Felixstowe Saturday afternoon service comes through Roade cutting at a fair pace with GBRf's 66768 leading. With the fast lines via Weedon closed all weekend for engineering works some workers are seen undertaking work on the cutting wall to the top left. They appeared to be drilling into the missionary and attaching harness points. 
 Keywords: 66768 12.03 Birch Coppice-Felixstowe North 4L05 Hyde Road bridge GBRf

The long but rather lightly loaded 4L05 12.03 Birch Coppice

to Felixstowe Saturday afternoon service comes through Roade cutting at a fair pace with GBRf's 66768 leading. With the fast lines via Weedon closed all weekend for engineering works some workers are seen undertaking work on the cutting wall to the top left. They appeared to be drilling into the missionary and attaching harness points.