Image DR73947, 14.13 Nuneaton Civil Engineers-Milton Keynes Central (6J62, 3L), Roade cutting

DR73947, 14.13 Nuneaton Civil Engineers-Milton Keynes Central (6J62, 3L), Roade cutting
DR73947, 14.13 Nuneaton Civil Engineers-Milton Keynes Central (6J62, 3L), Roade cutting 
 Normally the movement of a track machine would not attract my attention but as the slow lines were shut DR73947 was forced to make its journey on the up fast via the Weedon route. With a timed maximum speed of sixty miles per hour, this would be a challenge for signallers as there would inevitably be problems behind the train with the following services checked. Indeed, the 14.13 Nuneaton to Milton Keynes did cause some problems with a parade of Pendolinos caught up in its wake running on caution for some distance. The Colas-operated Plasser & Theurer 08-4x4/4S-RT Switch & Crossing Tamper is seen passing through Roade cutting. 
 Keywords: DR73947 14.13 Nuneaton Civil Engineers-Milton Keynes Central 6J62 Roade cutting
DR73947, 14.13 Nuneaton Civil Engineers-Milton Keynes Central (6J62, 3L), Roade cutting 
 Normally the movement of a track machine would not attract my attention but as the slow lines were shut DR73947 was forced to make its journey on the up fast via the Weedon route. With a timed maximum speed of sixty miles per hour, this would be a challenge for signallers as there would inevitably be problems behind the train with the following services checked. Indeed, the 14.13 Nuneaton to Milton Keynes did cause some problems with a parade of Pendolinos caught up in its wake running on caution for some distance. The Colas-operated Plasser & Theurer 08-4x4/4S-RT Switch & Crossing Tamper is seen passing through Roade cutting. 
 Keywords: DR73947 14.13 Nuneaton Civil Engineers-Milton Keynes Central 6J62 Roade cutting

Normally the movement of a track machine would not attract

my attention but as the slow lines were shut DR73947 was forced to make its journey on the up fast via the Weedon route. With a timed maximum speed of sixty miles per hour, this would be a challenge for signallers as there would inevitably be problems behind the train with the following services checked. Indeed, the 14.13 Nuneaton to Milton Keynes did cause some problems with a parade of Pendolinos caught up in its wake running on caution for some distance. The Colas-operated Plasser & Theurer 08-4x4/4S-RT Switch & Crossing Tamper is seen passing through Roade cutting.