Darlington is not usually a destination for LNER services from King's Cross. However, as engineering works had closed the route north from there to Newcastle the dreaded bustitution was in operation! Taken from a long bank adjacent to the Dowmac concrete plant at Tallington 800125 heads north with the 08.30 King's Cross to Darlington service.
|