Image 66568, Crewe Basford Hall-Crewe Basford Hall (6Y10), 66569, Crewe Basford Hall-Crewe Basford Hall return (6Y11) & 390126, VT 09.34 Glasgow Central-London Euston (1M05, 1L), Ashton Road bridge

66568, Crewe Basford Hall-Crewe Basford Hall (6Y10), 66569, Crewe Basford Hall-Crewe Basford Hall return (6Y11) & 390126, VT 09.34 Glasgow Central-London Euston (1M05, 1L), Ashton Road bridge
66568, Crewe Basford Hall-Crewe Basford Hall (6Y10), 66569, Crewe Basford Hall-Crewe Basford Hall return (6Y11) & 390126, VT 09.34 Glasgow Central-London Euston (1M05, 1L), Ashton Road bridge 
 Whilst 66568 and 66569 sit switched off on the up and down fast lines between Roade and Ashton 390126 passes on the up slow line working the 09.34 Glasgow Central to Euston. The Pendolino was diverted from its usual route due to engineering work that the two infrastructure trains seen here were supporting. Rather than the more common Sunday closure as it would appear the engineering possession was part of a ten-day scheme to undertake various work on the Weedon line taking full advantage of the much reduced COVID timetable. 
 Keywords: 66568 6Y10 66569 Crewe Basford Hall 6Y11 390126 09.34 Glasgow Central-London Euston 1M05 Ashton Road bridge.jpg
66568, Crewe Basford Hall-Crewe Basford Hall (6Y10), 66569, Crewe Basford Hall-Crewe Basford Hall return (6Y11) & 390126, VT 09.34 Glasgow Central-London Euston (1M05, 1L), Ashton Road bridge 
 Whilst 66568 and 66569 sit switched off on the up and down fast lines between Roade and Ashton 390126 passes on the up slow line working the 09.34 Glasgow Central to Euston. The Pendolino was diverted from its usual route due to engineering work that the two infrastructure trains seen here were supporting. Rather than the more common Sunday closure as it would appear the engineering possession was part of a ten-day scheme to undertake various work on the Weedon line taking full advantage of the much reduced COVID timetable. 
 Keywords: 66568 6Y10 66569 Crewe Basford Hall 6Y11 390126 09.34 Glasgow Central-London Euston 1M05 Ashton Road bridge.jpg

Whilst 66568 and 66569 sit switched off on the up

and down fast lines between Roade and Ashton 390126 passes on the up slow line working the 09.34 Glasgow Central to Euston. The Pendolino was diverted from its usual route due to engineering work that the two infrastructure trains seen here were supporting. Rather than the more common Sunday closure as it would appear the engineering possession was part of a ten-day scheme to undertake various work on the Weedon line taking full advantage of the much reduced COVID timetable.