|
The window boxes do their best to disguise the ratherugly modernisation of Insch signal box! Underneath the UPVC cladding and corrugated roof lies a delightful GNSR Type 2a wooden building opened in 1886 that is fitted with a twenty lever frame. It controls the level crossing and marks the eastern end of the double track section to Kennethmont. |
||||
|