|
A busy scene at Spean Bridge station northeast of FortWilliam sees 156456 to the left pausing with the 10.10 Mallaig to Glasgow Queen Street train. To the right, 156445 has been waiting for a few minutes with the 08.21 Glasgow to Mallaig. On the platform is the former signal box that tankfully was not knocked down when the line went over to RETB control in 1988. |
||||
|