Image 222021, EM 07.47 London St. Pancras-Corby (1M05, 8L), Wellingborough Driver Way bridge

222021, EM 07.47 London St. Pancras-Corby (1M05, 8L), Wellingborough Driver Way bridge
222021, EM 07.47 London St. Pancras-Corby (1M05, 8L), Wellingborough Driver Way bridge 
 Having made its stop at Wellingborough 222021 gets underway with the 07.47 St. Pancras to Corby 'stopper' service. Just north of Wellingborough, the Meridian will cross at Harrowden Junction onto the down slow to continue to Kettering and then Corby diverging from the MML at Kettering North Junction. When the slow lines are fully re-opened here at Wellingborough these services will utilise them all the way to and from Bedford and using the old platform three (down trains) and the new platform four (up trains). 
 Keywords: 222021 07.47 London St. Pancras-Corby 1M05 Driver Way bridge Wellingborough Meridian Eat Midlands Railway
222021, EM 07.47 London St. Pancras-Corby (1M05, 8L), Wellingborough Driver Way bridge 
 Having made its stop at Wellingborough 222021 gets underway with the 07.47 St. Pancras to Corby 'stopper' service. Just north of Wellingborough, the Meridian will cross at Harrowden Junction onto the down slow to continue to Kettering and then Corby diverging from the MML at Kettering North Junction. When the slow lines are fully re-opened here at Wellingborough these services will utilise them all the way to and from Bedford and using the old platform three (down trains) and the new platform four (up trains). 
 Keywords: 222021 07.47 London St. Pancras-Corby 1M05 Driver Way bridge Wellingborough Meridian Eat Midlands Railway

Having made its stop at Wellingborough 222021 gets underway with

the 07.47 St. Pancras to Corby 'stopper' service. Just north of Wellingborough, the Meridian will cross at Harrowden Junction onto the down slow to continue to Kettering and then Corby diverging from the MML at Kettering North Junction. When the slow lines are fully re-opened here at Wellingborough these services will utilise them all the way to and from Bedford and using the old platform three (down trains) and the new platform four (up trains).