Image 43125, GW 07.40 Paignton-London Paddington (1A12), Baulking

43125, GW 07.40 Paignton-London Paddington (1A12), Baulking
43125, GW 07.40 Paignton-London Paddington (1A12), Baulking 
 The lookout gets himself into a stable and safeposition as 43125 passes him at full line speed with the 07.40 Paignton to Paddington. The scene is at Baulking between Didcot and Swindon and shows the slow progress being made with the GWML electrification that should now be ready to be energised. After a very foggy start to the day, that considerably slowed my journey from Northamptonshire, the sun was beginning to burn through. 
 Keywords: 43125 07.40 Paignton-London Paddington 1A12 Baulking
43125, GW 07.40 Paignton-London Paddington (1A12), Baulking 
 The lookout gets himself into a stable and safeposition as 43125 passes him at full line speed with the 07.40 Paignton to Paddington. The scene is at Baulking between Didcot and Swindon and shows the slow progress being made with the GWML electrification that should now be ready to be energised. After a very foggy start to the day, that considerably slowed my journey from Northamptonshire, the sun was beginning to burn through. 
 Keywords: 43125 07.40 Paignton-London Paddington 1A12 Baulking

The lookout gets himself into a stable and safeposition as

43125 passes him at full line speed with the 07.40 Paignton to Paddington. The scene is at Baulking between Didcot and Swindon and shows the slow progress being made with the GWML electrification that should now be ready to be energised. After a very foggy start to the day, that considerably slowed my journey from Northamptonshire, the sun was beginning to burn through.