The hydraulic breaker was having to do very little work demolishing the bridge ramp walls at Back Lane in Souldrop. The mortar was doing nothing with the Victorian bricks being simply pulled off in a cloud of dust. The wall was at quite an alarming angle hence the need to to demolish and rebuild with work scheduled to be completed by February 2019.
|