|
When (if?) the east-west rail link is developed I suspectthat this level crossing over the Bicester Eastern Perimeter road will disappear and a huge bridge constructed. Network Rail's obsession with the elimination of level crossings accross the network will mean a huge number of bridges will be needed over this line in the eighteen miles or so between Bicester and Bletchley. |
||||
|